There's lots of talk on Facebook regarding another recent weekend update to the N-delius computer system leading to massive problems. In addition, these comments came in recently on the blog:-
******
It system's that are not fit for purpose, being unable to put entries on the systems will lead to mistakes.
******
You're closer to the truth than you think! I'm ex-probation IT, so I have the answer to this - you were (and most probably still are!) using Lotus for email as NOMS would buy massive amounts of licences at knock-down prices because they were buying the obsolete version that wasn't even being supported anymore, you were using Internet Explorer 6 (donkeys years old) for a browser as they couldn't figure a way of making their software work with never version, CRAMS because they sunk so much money into it they are probably still paying the bill, and OASys because it was compatible with the (as previously mentioned obsolete) Lotus Notes. I bet you're all still using Windows XP too (which Microsoft don't support anymore).
******
No Lotus notes has gone and been replaced with something far worse.
******
Still got Lotus notes in NPS!
******
My colleague was unable to log on all day because the portal had reached maximum warp speed! Told him you have to get to work for 8am to guarantee getting logged in! Not great if you have kids to drop off at school! Meanwhile we are fighting over the one private interview room...' my service user has social phobia and paranoia...well, mine wants to talk about assaulting his partner...mine tends to shout and tap loudly on the table due to ADHD'. Who is more worthy? We all make a dash for it and the rest sit in the open plan area with the general public! Welcome to the modern age, this is TR, inclusive style!
--oo00oo--
Those with long memories will remember the vast amount of money that was wasted on the failed C-Nomis computer system that was supposed to connect the prison and probation service IT systems. The sad fact is that the government always says it wants savings in public services and then blows the lot, and more, on computer systems that fail. Here's details of the latest (ok I know it's Scotland, but it's the same story down here) on a very informative blog site called Campaign4Change:-
Another public sector IT project disaster – but a useful failure if lessons are disseminated
Government Computing reported on 1 July 2016 that the Scottish Police Authority has agreed with Accenture to end their “i6” programme. It’s a classic public sector IT project disaster. It failed for the usual reasons (see below). What marks it out is the unusual post-failure approach: a limited openness. Police in Scotland and the Scottish Government plan a review of what went wrong, which is likely to be published.
Usually senior civil and public servants in Whitehall, local government in England and Wales and the NHS rush to shut the blinds when an IT-enabled change project goes awry, which is what has happened recently after failures of the GP Support Services contract with Capita. [GP magazine Pulse reports that NHS England is to withhold report on primary care support problems until 2017.]
The police in Scotland and the Scottish Parliament are being open but not completely. Their settlement with Accenture remains confidential, but the Scottish Police Authority has published the full business case for i6 and – under FOI – early “Gateway” reviews and “Healthcheck” reports, though with quite a few redactions.
Despite FOI, it’s almost unknown for Whitehall, the NHS or local government in England and Wales, to publish Gateway reviews of big IT projects. All this means there may be a genuine attempt in Scotland to learn lessons from the failure of the i6 project, and perhaps even let the public sector as a whole benefit from them (if it’s interested),
Due originally to go live last December, and then in the autumn this year, i6 hit problems within months of the start of the contract with Accenture. The contract was signed in June 2013, work started in July and the two sides were reported as being in mediation by August 2013.
Exemplar?
But the programme had followed well-established preparatory routines. One internal report described the procurement approach as an exemplar for the rest of the public sector. Yet it still ended in failure.
In fact i6 followed the classic script of a traditional public sector IT-based project disaster:
- An over-ambitious plan for widespread “integration” – which is one of the most dangerous words in the history of public sector IT-enabled change projects. It seemed a great idea at the time: to save vast sums by bringing together in a single system similar things done in different ways by formerly separate organisations.
- A variety of early independent reports that highlighted risks and strengths of the programme but didn’t ask the biggest question of all: could a single national system ever work satisfactorily given the amount of organisational change required – changes that would impose on the system design constant modification as end-users discovered new things they wanted and didn’t want that were in the original design – and changes that would require a large team on the police side to have the time to understand the detail and convey it accurately to Accenture.
- An assumption that the supplier would be able to deliver an acceptable system within tight deadlines in a fast-changing environment.
- Milestones that were missed amid official denials that the project was in disarray.
- An agreement to end the contract that was on the basis of a secret settlement, which brought little or no accountability for the failure. Nobody knows how much has been spent on the project in staff and managerial time, hiring of various consultancies, the commissioning of various reports, and money paid over to the supplier.
What are the lessons?
The 10-year programme, which was said to cost between £40m and £60m, was ambitious. It was supposed to replace 135 IT-and paper-based systems across Scotland with a single national integrated system that would be rolled out to all Police Scotland divisions.
A “Gateway review” of the project in March 2013 said the project involved the “largest organisagtional change in the history of Scottish policing”. The released documents have much praise for the police’s preparatory work on the contract with Accenture. Private consultants were involved as the technical design authority. Deloitte was hired for additional support. There were regular “healthcheck” and Gateway reviews.
Too ambitious?
Bringing together dozens of systems and paper-based processes into a new standardised system that’s supposed to work across a variety of business units, requires – before a single new server is installed – agreement over non-IT changes that are difficult in practice to achieve. It’s mainly a business-change project rather than an IT one. The business case promised “Full interoperability, of processes and technology, at local and national level.” Was that ever really possible?
The disastrous Raytheon/Home Office e-borders project was a similar classic public sector project failure based on “integration”. Although it was a much bigger project and far more complex than i6, it followed similar principles: a new national system that would replace a patchwork of different systems and business processes.
Raytheon could not force change on end-users who did not want change in the way Raytheon envisaged. The Home Office wasted hundreds of millions on the project, according to the National Audit Office which said,
More recently the GP support services contract with Capita has run into serious problems largely because of an overly ambitious objective of replacing fragmented ways of working with a national “common good” system. A Capita spokesperson said of the new system: ‘NHS England asked Capita to transform what was a locally agreed, fragmented primary care support service, to a national standardised system.”
It’s naïve for politicians and senior public servants to view integration as a public benefit without questioning its necessity in the light of the huge risks. [Mao Tsedong saw the Great Leap Forward as a public benefit. It was a costly catastrophe, in human and financial terms.]
Disputes over whether proposals would meet actual needs?
It appears that i6 officials found Accenture’s solutions unconvincing; but it’s likely Accenture found that requirements were growing and shifting, leading to disagreements over varying interpretations of different parts of the contract. Accenture could not compel cooperation by various forces even it wanted to.
It may work elsewhere – but that doesn’t mean it’ll work for you. This is one of the oldest lessons from countless disaster in the history of the IT industry. It was listed as a key factor in some of the world’s biggest IT disasters in “Crash”.
The business case for i6 says:
Clearly i6 is a political scheme. It’s easy in the public sector to declare at the outset any amount of anticipated savings when it’s clear to everyone that the actual audited savings – or losses – will probably never be announced.
Initial costs were put at £12m, but later revisions put the cost nearer to £46m. More recently costs of £60m have been reported. In 2013, cashable savings to be made by developing i6 were said to be over £61m, with the total cashable and non-cashable savings estimated to be £218m over ten years. That said, the police appear to have paid over relatively small sums to Accenture, not tens of millions of pounds.
Lessons from past failures have been learned – really?
The Scottish Police Authority gave an unequivocal assurance to its members in June 2013 that i6 will “not suffer the same fate as other high profile large scale IT projects”. This is what the Authority said to its members,
The 10-year programme, which was said to cost between £40m and £60m, was ambitious. It was supposed to replace 135 IT-and paper-based systems across Scotland with a single national integrated system that would be rolled out to all Police Scotland divisions.
A “Gateway review” of the project in March 2013 said the project involved the “largest organisagtional change in the history of Scottish policing”. The released documents have much praise for the police’s preparatory work on the contract with Accenture. Private consultants were involved as the technical design authority. Deloitte was hired for additional support. There were regular “healthcheck” and Gateway reviews.
Too ambitious?
Bringing together dozens of systems and paper-based processes into a new standardised system that’s supposed to work across a variety of business units, requires – before a single new server is installed – agreement over non-IT changes that are difficult in practice to achieve. It’s mainly a business-change project rather than an IT one. The business case promised “Full interoperability, of processes and technology, at local and national level.” Was that ever really possible?
The disastrous Raytheon/Home Office e-borders project was a similar classic public sector project failure based on “integration”. Although it was a much bigger project and far more complex than i6, it followed similar principles: a new national system that would replace a patchwork of different systems and business processes.
Raytheon could not force change on end-users who did not want change in the way Raytheon envisaged. The Home Office wasted hundreds of millions on the project, according to the National Audit Office which said,
“During the period of the e-borders programme the Department made unrealistic assumptions about programme delivery without recognising the importance of managing a diverse range of stakeholders.
“Delivering the e-borders vision requires that more than 600 air, ferry and rail carriers supply data on people they are bringing in and out of the country, while around 30 government agencies supply data on persons of interest.
“During the e-borders period, the contract made Raytheon responsible for connecting e-borders to these stakeholders’ systems, under the Department’s strategic direction. But carriers and agencies expressed general concerns about the costs and other implications of revising their systems to connect to e-borders, including the interfaces they were expected to use.
“The contract strongly incentivised Raytheon to deliver the roll-out to the agreed schedules but provided less incentive for Raytheon to offer a wider choice of interfaces…Lack of clarity on what was legal under European law further exacerbated the difficult relationships with carriers. These difficulties affected progress in rolling out e-borders from the outset…
“Following the cancellation of the e-borders contract in 2010, the Department [Home Office] took more direct ownership of external relationships instead of working through Raytheon. Transport carriers told us there is now a better understanding of needs and requirements between themselves and the Department.”The NHS National Programme for IT [NPfIT] was another similar failure, in part because of overly ambitious plans for “integration” – on a scale that could never be imposed on a diverse range of largely autonomous NHS organisations. Some hospitals and GPs did not want a national system that did less than their existing systems. Why would they want to replace their own proven IT with cruder standardised systems for the sake of the common good?
More recently the GP support services contract with Capita has run into serious problems largely because of an overly ambitious objective of replacing fragmented ways of working with a national “common good” system. A Capita spokesperson said of the new system: ‘NHS England asked Capita to transform what was a locally agreed, fragmented primary care support service, to a national standardised system.”
It’s naïve for politicians and senior public servants to view integration as a public benefit without questioning its necessity in the light of the huge risks. [Mao Tsedong saw the Great Leap Forward as a public benefit. It was a costly catastrophe, in human and financial terms.]
Disputes over whether proposals would meet actual needs?
It appears that i6 officials found Accenture’s solutions unconvincing; but it’s likely Accenture found that requirements were growing and shifting, leading to disagreements over varying interpretations of different parts of the contract. Accenture could not compel cooperation by various forces even it wanted to.
It may work elsewhere – but that doesn’t mean it’ll work for you. This is one of the oldest lessons from countless disaster in the history of the IT industry. It was listed as a key factor in some of the world’s biggest IT disasters in “Crash”.
The business case for i6 says:
“The [Accenture] solution is based on a system delivered to 80,000 officers in the Guardia Civil, Spain’s national police force.
“The procured solution includes software components, software licences, specialist hardware, integration tools and services, business change activities, implementation services, reporting capabilities, data management activities, ongoing support, optional managed service arrangements, additional integration services and other relevant services necessary for the successful implementation of the solution.”Is it wise to promise huge savings many times greater than projected costs?
Clearly i6 is a political scheme. It’s easy in the public sector to declare at the outset any amount of anticipated savings when it’s clear to everyone that the actual audited savings – or losses – will probably never be announced.
Initial costs were put at £12m, but later revisions put the cost nearer to £46m. More recently costs of £60m have been reported. In 2013, cashable savings to be made by developing i6 were said to be over £61m, with the total cashable and non-cashable savings estimated to be £218m over ten years. That said, the police appear to have paid over relatively small sums to Accenture, not tens of millions of pounds.
Lessons from past failures have been learned – really?
The Scottish Police Authority gave an unequivocal assurance to its members in June 2013 that i6 will “not suffer the same fate as other high profile large scale IT projects”. This is what the Authority said to its members,
“Delivery Assurance – SPA [Scottish Police Authority] members have sought and been provided with significant assurance that the i6 programme will deliver the intended outcomes and not suffer the same fate as other high profile large scale IT projects.
“The robustness and diligent detail that has gone into the full business case itself provides much of that assurance. Further delivery confidence around i6 comes from a number of sources including:
1. Rigorous Programme Governance.
2. Widespread User Engagement and Robust Requirements Gathering.
3. The creation of a ‘live’ multi-sector i6 Learning Network.
4. The formation of strategic partnership groups.
5. Alignment to the wider Scottish Government Digital Strategy.
6. Active learning from the Audit Scotland Review of Public Sector IT Projects and the Common Performance Management Project (‘Platform’).
7. Significant time and investment in the use of Competitive Dialogue.
8. The formation of a strong and consistent programme team with integrated professional advice & support.
9. Exposure to the full independent OGC Gateway Review Process.
10. An independent Scottish Government Technical Assurance Review.
A growing list of changes.
In February 2016 Accenture said, “This is a very complex project. The complexity of the solution, which has been driven by the client, has increased significantly over the last two years.” This suggests the scope and specification grew as the many different stakeholders gradually formed a view of what they wanted.
Criticism of the supplier, as if it were the only party responsible or delivering the system.
Police Scotland told members of the Scottish Parliament in February 2016 that Accenture has let the police down. One question auditors may ask is whether it would have been better for local policing divisions to keep control of their own IT.
Internal reviews too soft, too reassuring?
A technical assurance review in June 2013 gave the i6 project an “amber/green” status. A secret settlement leaves taxpayers having no clue of how much money has gone down the drain. The Scottish Police Authority says the settlement is confidential. “The terms of the agreement are commercially confidential. However we can confirm that the settlement results in no financial detriment to the police budget.”
The current police budget may not be affected but how much has already been paid and how much of this is wasted? If no figures are ever given, how can there be proper accountability that could deter a new set of officials making similar mistakes in a future project?
Doomsday Register?
If the public sector kept a published “Doomsday” register of failed projects and programmes and the mistakes made in them, as identified by auditors, the same mistakes would be less likely to be repeated. Perhaps i6 could be the first entry into a new Doomsday register.
The future’s looking bright (?).
When a project is cancelled, it’s almost inevitable that the consequences will be declared to be minimal; and we’re all left wondering why the project was needed in the first place if the future is so rosy.
Half the story
As things stand, when a council, police, NHS, or Whitehall project fails and millions of pounds, sometimes tens of millions, even billions, are lost, there’s no incentive for anyone but taxpayers to care – and even then they don’t know half the story.
In the case of i6, once the settlement with Accenture is finalised – with hardly anyone knowing the details – officialdom is free to embark on a similar project in a few years time, with different people involved, and describing it in a different way. Who cares when the public sector has another IT disaster that follows an age-old script?
Project summary
The i6 project was introduced to merge more than 130 different computer and paper systems left in place after eight regional forces were merged to form Police Scotland. Police Scotland told MSPs in February that they were looking at contingency options because they could not solve scores of faults that had emerged during testing.
Officers involved in the tests said at one point they had found 12 critical errors that made it unusable, and a total of 76 defects that required further work. Accenture said in February that i6 passed its internal testing but flaws emerged when Police Scotland tested the programme.
The Guardian reports on another IT-enabled project problems in Scotland.
“Scottish ministers have already been forced to seek an extension from the European commission after its new £178m farming payments system had to be dramatically scaled back and failed to meet an EU deadline. There have been significant delays and cost rises too in a new call-handling and IT system for NHS Scotland’s telephone advice service, NHS 24, which has not yet become operational. Its budget has risen by 55% to nearly £118m, and it is four years late.”
Scottish Police Authority and Accenture terminate i6 contract – Government Computing
2. Widespread User Engagement and Robust Requirements Gathering.
3. The creation of a ‘live’ multi-sector i6 Learning Network.
4. The formation of strategic partnership groups.
5. Alignment to the wider Scottish Government Digital Strategy.
6. Active learning from the Audit Scotland Review of Public Sector IT Projects and the Common Performance Management Project (‘Platform’).
7. Significant time and investment in the use of Competitive Dialogue.
8. The formation of a strong and consistent programme team with integrated professional advice & support.
9. Exposure to the full independent OGC Gateway Review Process.
10. An independent Scottish Government Technical Assurance Review.
A growing list of changes.
In February 2016 Accenture said, “This is a very complex project. The complexity of the solution, which has been driven by the client, has increased significantly over the last two years.” This suggests the scope and specification grew as the many different stakeholders gradually formed a view of what they wanted.
Criticism of the supplier, as if it were the only party responsible or delivering the system.
Police Scotland told members of the Scottish Parliament in February 2016 that Accenture has let the police down. One question auditors may ask is whether it would have been better for local policing divisions to keep control of their own IT.
Internal reviews too soft, too reassuring?
A technical assurance review in June 2013 gave the i6 project an “amber/green” status. A secret settlement leaves taxpayers having no clue of how much money has gone down the drain. The Scottish Police Authority says the settlement is confidential. “The terms of the agreement are commercially confidential. However we can confirm that the settlement results in no financial detriment to the police budget.”
The current police budget may not be affected but how much has already been paid and how much of this is wasted? If no figures are ever given, how can there be proper accountability that could deter a new set of officials making similar mistakes in a future project?
Doomsday Register?
If the public sector kept a published “Doomsday” register of failed projects and programmes and the mistakes made in them, as identified by auditors, the same mistakes would be less likely to be repeated. Perhaps i6 could be the first entry into a new Doomsday register.
The future’s looking bright (?).
When a project is cancelled, it’s almost inevitable that the consequences will be declared to be minimal; and we’re all left wondering why the project was needed in the first place if the future is so rosy.
Half the story
As things stand, when a council, police, NHS, or Whitehall project fails and millions of pounds, sometimes tens of millions, even billions, are lost, there’s no incentive for anyone but taxpayers to care – and even then they don’t know half the story.
In the case of i6, once the settlement with Accenture is finalised – with hardly anyone knowing the details – officialdom is free to embark on a similar project in a few years time, with different people involved, and describing it in a different way. Who cares when the public sector has another IT disaster that follows an age-old script?
Project summary
The i6 project was introduced to merge more than 130 different computer and paper systems left in place after eight regional forces were merged to form Police Scotland. Police Scotland told MSPs in February that they were looking at contingency options because they could not solve scores of faults that had emerged during testing.
Officers involved in the tests said at one point they had found 12 critical errors that made it unusable, and a total of 76 defects that required further work. Accenture said in February that i6 passed its internal testing but flaws emerged when Police Scotland tested the programme.
The Guardian reports on another IT-enabled project problems in Scotland.
“Scottish ministers have already been forced to seek an extension from the European commission after its new £178m farming payments system had to be dramatically scaled back and failed to meet an EU deadline. There have been significant delays and cost rises too in a new call-handling and IT system for NHS Scotland’s telephone advice service, NHS 24, which has not yet become operational. Its budget has risen by 55% to nearly £118m, and it is four years late.”
Scottish Police Authority and Accenture terminate i6 contract – Government Computing
A friend of mine who is a PO was encouraged to join the Nomis co-ordination scheme as a contributor but it soon became clear that this was just so that they could say that they had front line staff working with them-from day one she was sidelined, ignored by IT boffins as 'they knew best' and had a front seat as to the amount of money that was wasted.....come forward to this week and it is clear that Delius is going through its own crisis, with files disappearing-dead files being ressurected and more importantly managers having such a slavish devotion to a deeply flawed system that when something goes missing the default position is 'You must have forgotten to do it'....we live in dangerous times colleagues..and to all those staff who believed that the system would reward them for not striking and for not speaking ...you're wrong..hopefully the change at the top will provide the golden bridge that the MOJ has been looking for as an excuse for reunification...cheaper to pay off all the contracts now than the trouble that's coming down the line (E3 and the prison crisis)
ReplyDeleteAs Jim says, its a sorry tale. But they are not sorry.
DeleteSlightly off-topic, but Gove's been sacked - can I get an LOL? :D
ReplyDelete"when something goes missing the default position is 'You must have forgotten to do it'..."
ReplyDeleteThe May Queen has not forgotten to 'do' Gove, & he's gone missing!
Priti patel next
ReplyDeleteMichael Gove sacked....opportunity or disaster...watch Pritti Patel for Justice
ReplyDeletePlease not Patel or Truss...
DeleteWatch for James Brokenshire at Justice
ReplyDeleteWorse still, might be Jezza *unt
Deletewhat if Grayling gets his old job back?
DeleteWe've been Trussed up!
DeleteYes she has reputation for enforcing cuts. At one stage thought her ministers dealing with health, education, social work, criminal justice would be those with more concilliatory approach to be welcomed. But Truss and now Hunt staying with health. Will not be case. Shes surrounding herself with her people. Steady as she goes steering the same course.
ReplyDeleteGrayling - Transport Minister! That's a humiliating act.
ReplyDeleteTickets please!!!!
Liz Truss is the new SoS for Justice. In case anyone doubts her ability, please watch the leg-end in action:
ReplyDeletehttps://m.youtube.com/watch?v=bRhlRM6rYck